Construction Photos
Chuck and crew
Pouring Foundation
Over the valley
Finished Foundation

The Foundation - July 2003

(click photos to enlarge)


The foundation is about 4 foot under ground on the uphill side and 4 foot out of ground on down hill side.  It took 40 yards of concrete to pour the foundation which does not include the basement wall which was not poured at the time of these pictures.  The builder said this foundation could hold a 10 story building.